Iconic bridge in Sydney

Confidential Project

 

Technical structures advisor to the Sydney program Alliance for major maintenance and upgrade works, including design verification of temporary works designs.


CSS staff were involved in the detailed design and construction phase support services, (including temporary works verification) to the Sydney program Alliance for this confidential project.

The team were very proud to be part of this significant project, allowing the community to enjoy and continue to safely use this iconic piece of infrastructure indefinitely into the future.

Technical innovations achieved

Confidential

Benefits to the client

The Sydney Program Alliance was able to leverage Vince’s extensive experience to assist with the advanced analysis and designs required for this project. Holistic structure behaviour was integrated into advanced non-linear Finite Element analysis to better understand how this complex structure behaves and assist in the development of remedial works required. Vince was also able to assist the Alliance get the remedial work designs approved by the end client.

The CSS team were engaged to assist with the detailed design and documentation of the remedial works required.

 
STAFF INVOLVEMENT

Vince Scolaro:
Bridge Specialist Technical Advisor

Brendan Quinn:
Senior Bridge Drafter

Michael Kent:
Senior Structures Drafter

CLIENT

Sydney Program Alliance

Previous
Previous

Eastern Creek Raceway